Have an idea you would like to see implemented? Post it here!

Grid+ V3 ANR Stressing

I would like the option to start, stop and pause the ANR calibration process. I have a custom water loop with a large reservoir that take time for the temperatures to equalize. My loop needs more than 30 minuets to reach max temp so CAM always calibrates to much lower temps.

Also having the option to stress the system yourself would be nice as it only stresses my CPU to 50% and doesn't do anything to the GPU.

6 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Chris shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base